Joliet Technology Center
Joliet Technology Center is an operational data center in Joliet, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | 41.45955, -88.05529 |
Power and grid
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Northern Border PL Co, interstate pipeline, 600 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.8 °C (2001 to 2025) |
| Cooling degree days | 483 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.84 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Joliet Technology Center?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Data centers near Joliet
- Datacenter (386) 28.3 km · 1.9 MW
- Argonne NL Aurora 29.5 km · 60 MW
- NETRIX - ALSIP 34.2 km
- Lincoln Rackhouse Aurora 37.3 km · 10 MW
- Centersquare Chicago (ORD4) 38.3 km · 32 MW
- Vultr Chicago Cluster 38.3 km · 4.6 MW
- Equinix CH7 - Westmont 39.9 km · 4.3 MW
- CyrusOne data center in Aurora 40.6 km · 22 MW