LCL Wallonia One
LCL Wallonia One is an operational data center operated by LCL Belgium in Gembloux, Belgium. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | LCL Belgium |
| Facility power | 13 MW (range 6.6 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,938 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 11 networks PeeringDB. |
| Address | Rue Guillaume Fouquet 14 |
| Coordinates | 50.50353, 4.71776 |
| Website | lcl.be |
Power and grid
| Nearest high-voltage substation | Solvay, 150 kV, 7.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380kV Tergnée, 380 kV, 12.9 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 7.7 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.6 °C (2001 to 2025) |
| Cooling degree days | 70 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.04 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does LCL Wallonia One use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is LCL Wallonia One to the power grid?
The nearest high-voltage substation in OpenStreetMap is Solvay (150 kV), about 7.4 km away.
How clean is the power for LCL Wallonia One?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates LCL Wallonia One?
LCL Belgium.
Data centers near Gembloux
- Google Datacenter 12.5 km · 69 MW
- Unix-Solutions DC Leuven 38.0 km
- ETIX BelgiumDC #1 39.4 km
- WDC 39.5 km · 3.4 MW
- O 41.9 km · 0.9 MW
- LCL Brussels South 42.6 km
- VERIXI Louise DC 43.2 km
- Woluwedal 102 43.6 km
More LCL Belgium data centers
- LCL Brussels West Belgium
- LCL Antwerp Belgium
- LCL Brussels (Diegem) Belgium
- LCL Brussels South Belgium