Lumen Frankfurt 2
Lumen Frankfurt 2 is an operational data center operated by Colt Technology Services in Frankfurt, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Colt Technology Services |
| Networks | 2 networks PeeringDB. |
| Address | Kleyerstrasse 82 |
| Coordinates | 50.10030, 8.63461 |
| Website | lumen.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 800 m away (Netzdienste Rhein-Main) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 380 kV, 1.5 km away |
| HV substations within 10 km | 37 |
| Power plants within 50 km | 3.3 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 233 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Lumen Frankfurt 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 800 m away.
How clean is the power for Lumen Frankfurt 2?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Lumen Frankfurt 2?
Colt Technology Services.
Data centers near Frankfurt
- NewColo Frankfurt 159 m
- 3U Rechenzentrum Frankfurt 204 m
- ITENOS Frankfurt (FRA1) 214 m · 14 MW
- Equinix FR5 - Frankfurt, KleyerStrasse 246 m · 37 MW
- aixit Frankfurt 365 m · 7.4 MW
- ColoCenter Frankfurt 373 m
- Telehouse - Frankfurt 493 m · 3.2 MW
- Telehouse data center in Frankfurt am Main 575 m · 13 MW
More Colt Technology Services data centers
- COLT DC London United Kingdom
- Level(3) Brussels Belgium
- COLT DC Frankfurt Germany
- COLT Datacenter Turin Italy
- COLT DC Paris II France
- COLT DC Paris III France
- Colt DC Tokyo III Japan
- Global Crossing Joop Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.