Equinix FR5 - Frankfurt, KleyerStrasse is an operational data center operated by Equinix in Frankfurt, Germany. Our footprint estimate of its power is about 37 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power37 MW (range 19 MW to 59 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,193 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 16,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks558 networks, 35 internet exchanges
PeeringDB.
Also known asEXA Edge DC Frankfurt2 · Equinix FR5
AddressKleyerstrasse 90
Coordinates50.09885, 8.63200
Websiteequinix.com/locations/germany-colocation/frankfurt-data-centers/fr5

Power and grid

Nearest high-voltage substationUmspannwerk Kleyerstraße, 110 kV, 500 m away (Netzdienste Rhein-Main)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Frankfurt Südwest, 380 kV, 1.2 km away
HV substations within 10 km37
Power plants within 50 km3.3 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days233 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix FR5 - Frankfurt, KleyerStrasse use?

We estimate the facility power at about 37 MW. Estimate from building footprint, low confidence.

How close is Equinix FR5 - Frankfurt, KleyerStrasse to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Kleyerstraße (110 kV), about 500 m away.

How clean is the power for Equinix FR5 - Frankfurt, KleyerStrasse?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates Equinix FR5 - Frankfurt, KleyerStrasse?

Equinix.

Data centers near Frankfurt

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.