Mainova WebHouse
Mainova WebHouse is an operational data center in Frankfurt am Main, Germany. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.9 MW (range 3 MW to 9.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,917 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Gwinnerstraße 7-9, 60388, Frankfurt am Main |
| Coordinates | 50.13594, 8.73855 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 200 m away (Netzdienste Rhein-Main) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Frankfurt Nord, 220 kV, 2.6 km away |
| HV substations within 10 km | 35 |
| Power plants within 50 km | 3.0 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 233 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Mainova WebHouse use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
How close is Mainova WebHouse to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 200 m away.
How clean is the power for Mainova WebHouse?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Frankfurt am Main
- Iron Mountain FRA-1 269 m · 38 MW
- Equinix FR11 308 m · 9.1 MW
- firstcolo - FRA4 562 m
- Equinix FR2 - Frankfurt, North 700 m
- Equinix Germany GmbH 724 m · 12 MW
- Digital Realty FRA27 1.5 km · 4 MW
- Digital Realty FRA18 -22 1.5 km · 60 MW
- iNTERWERK Rechenzentrum 1.6 km · 4 MW
Sources