Equinix Germany GmbH is an operational data center operated by Equinix in Frankfurt am Main, Germany. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power12 MW (range 4.9 MW to 31 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 102,042 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asEquinix FR2 · Equinix FR2.6 · Equinix FR9
Coordinates50.14243, 8.73941
Websiteequinix.com/data-centers/europe-colocation/germany-colocation/frankfurt-data-centers/fr2

Power and grid

Nearest high-voltage substationUmspannwerk Kruppstraße, 110 kV, 300 m away (Netzdienste Rhein-Main)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Frankfurt Nord, 220 kV, 1.9 km away
HV substations within 10 km30
Power plants within 50 km3.0 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days233 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix Germany GmbH use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is Equinix Germany GmbH to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Kruppstraße (110 kV), about 300 m away.

How clean is the power for Equinix Germany GmbH?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates Equinix Germany GmbH?

Equinix.

Data centers near Frankfurt am Main

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.