Meta data center in Covington
Meta data center in Covington is an operational data center operated by Meta in Covington, United States. Our footprint estimate of its power is about 170 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 170 MW (range 85 MW to 272 MW) Estimate from building footprint, low confidence. Footprint estimate: about 141,596 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 73,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.60139, -83.70543 |
Power and grid
| Utility | Snapping Shoals El Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SOCO |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 20 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta data center in Covington use?
We estimate the facility power at about 170 MW. Estimate from building footprint, low confidence.
What chips does Meta data center in Covington use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How clean is the power for Meta data center in Covington?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Meta data center in Covington?
Meta.
Data centers near Covington
- Meta Stanton Springs Data Center 480 m · 151 MW
- Meta data center in Covington 808 m · 194 MW
- Meta data center in Covington 1.0 km · 92 MW
- QTS Suwanee 58.4 km · 34 MW
- QTS Atlanta-Suwanee (SUW1) 58.4 km · 67 MW
- Serverfarm ATL1 Atlanta 58.6 km
- Flexential - Atlanta/Norcross (ATL1/2) 60.2 km · 4.9 MW
- DC BLOX ATL1 - DCBLOX Atlanta 64.0 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.