Middletown Data Center
Middletown Data Center is an operational data center in Middletown, United States. Our footprint estimate of its power is about 4.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.4 MW (range 1.8 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 36,804 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Valley Pike 8209, Middletown |
| Coordinates | 39.01768, -78.29094 |
| Website | middletowndatacenter.com |
Power and grid
| Utility | Rappahannock Electric Coop (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Middletown Data Center use?
We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Middletown Data Center?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Middletown
- Data center in Warrenton 50.9 km · 18 MW
- Amazon Web Services data center in Gainesville 59.6 km · 15 MW
- Amazon IAD-55 60.0 km · 37 MW
- OVH US East Vint Hill 61.2 km · 9.6 MW
- Amazon IAD-197 62.8 km · 27 MW
- STACK NVA06 63.1 km · 62 MW
- Microsoft Leesburg Building 1 63.1 km · 31 MW
- Microsoft Leesburg Building 4 63.4 km · 26 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.