Penta Infra Brussel BRU01
Penta Infra Brussel BRU01 is an operational data center operated by Penta C.V. in Asse, Belgium. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Penta C.V. |
| Facility power | 2 MW (range 1 MW to 3.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,663 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | Nexus Datacenter |
| Address | Zone1 Research Park 340 / z1 |
| Coordinates | 50.88193, 4.28893 |
| Website | penta-infra.com/data-centers/brussels |
Power and grid
| Nearest high-voltage substation | 150kV Relegem, 150 kV, 1.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380kV Bruegel, 380 kV, 4 km away |
| HV substations within 10 km | 11 |
| Power plants within 50 km | 5.6 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 87 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Penta Infra Brussel BRU01 use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
How close is Penta Infra Brussel BRU01 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150kV Relegem (150 kV), about 1.3 km away.
How clean is the power for Penta Infra Brussel BRU01?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates Penta Infra Brussel BRU01?
Penta C.V..
Data centers near Asse
- Proximus Netcenter 7.3 km
- DC Evere 7.4 km
- Datahouse Belgium 8.1 km
- KevlinX Brussels 8.4 km · 8.8 MW
- VERIXI Louise DC 8.6 km
- Level(3) Brussels 9.1 km · 5.9 MW
- Belgacom Netcenter - 02MRI 9.7 km
- O 10.0 km · 0.9 MW
More Penta C.V. data centers
- Penta Infra Paris PAR01 France
- Penta Infra Amsterdam AMS01 Netherlands
- Penta Infra Cologne CGN01 Germany
- Penta Infra Copenhagen CPH01 Denmark
- Penta Infra Dusseldorf DUS01 Germany
- Penta Infra Geleen GLN01 Netherlands
- Penta Infra Hamburg HAM01 Germany
- Penta Infra Leeuwarden LEE01 Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.