Penta Infra Dusseldorf DUS01
Penta Infra Dusseldorf DUS01 is an operational data center operated by Penta C.V. in Meerbusch, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Penta C.V. |
| Networks | 5 networks PeeringDB. |
| Address | Düsseldorfer Str. 71b, 40667 Meerbusch |
| Coordinates | 51.24511, 6.69463 |
| Website | penta-infra.com/data-centers/duesseldorf |
Power and grid
| Nearest high-voltage substation | Station Büderich, 110 kV, 900 m away (Westnetz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Station Osterath, 220 kV, 5.1 km away |
| HV substations within 10 km | 15 |
| Power plants within 50 km | 14 GW in 61 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.6 °C (2001 to 2025) |
| Cooling degree days | 131 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Penta Infra Dusseldorf DUS01 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Station Büderich (110 kV), about 900 m away.
How clean is the power for Penta Infra Dusseldorf DUS01?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Penta Infra Dusseldorf DUS01?
Penta C.V..
Data centers near Meerbusch
- freenet Duesseldorf 1.6 km
- euNetworks Duesseldorf - site closed 7.0 km
- KPN DSSD2 7.4 km
- Equinix DU1 - Dusseldorf 8.3 km · 1.2 MW
- WIIT Datacenter DUS1, DUS2, DUS3, DUS4, DUS6, DUS7 8.9 km
- Lumen Duesseldorf 13.5 km
- Arelion Dusseldorf DDF/B 13.5 km
- NorthC Duesseldorf 13.6 km
More Penta C.V. data centers
- Penta Infra Paris PAR01 France
- Penta Infra Brussel BRU01 Belgium
- Penta Infra Amsterdam AMS01 Netherlands
- Penta Infra Cologne CGN01 Germany
- Penta Infra Copenhagen CPH01 Denmark
- Penta Infra Geleen GLN01 Netherlands
- Penta Infra Hamburg HAM01 Germany
- Penta Infra Leeuwarden LEE01 Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.