WIIT Datacenter DUS1, DUS2, DUS3, DUS4, DUS6, DUS7
WIIT Datacenter DUS1, DUS2, DUS3, DUS4, DUS6, DUS7 is an operational data center operated by WIIT Group (IT, DE, CH) in Düsseldorf, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | WIIT Group (IT, DE, CH) |
| Networks | 108 networks, 7 internet exchanges PeeringDB. |
| Also known as | Wiit AG DUS |
| Address | Am Gatherhof 44 |
| Coordinates | 51.26730, 6.81752 |
| Website | wiit.cloud |
Power and grid
| Nearest high-voltage substation | Station Rath, 380 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Power plants within 50 km | 15 GW in 62 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 105 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is WIIT Datacenter DUS1, DUS2, DUS3, DUS4, DUS6, DUS7 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Station Rath (380 kV), about 600 m away.
How clean is the power for WIIT Datacenter DUS1, DUS2, DUS3, DUS4, DUS6, DUS7?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates WIIT Datacenter DUS1, DUS2, DUS3, DUS4, DUS6, DUS7?
WIIT Group (IT, DE, CH).
Data centers near Düsseldorf
- KPN DSSD2 1.6 km
- euNetworks Duesseldorf - site closed 4.9 km
- Equinix DU1 - Dusseldorf 5.3 km · 1.2 MW
- freenet Duesseldorf 7.7 km
- Penta Infra Dusseldorf DUS01 8.9 km
- Lumen Duesseldorf 9.4 km
- Arelion Dusseldorf DDF/B 9.4 km
- NorthC Duesseldorf 9.5 km
More WIIT Group (IT, DE, CH) data centers
- WIIT Datacenter DUS5 Germany
- WIIT Datacenter MUC8 Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.