Data Center Directory

Equinix DU1 - Dusseldorf

Equinix DU1 - Dusseldorf is an operational data center operated by Equinix in Düsseldorf, Germany. Our footprint estimate of its power is about 1.2 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power1.2 MW (range 0.5 MW to 2.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,786 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 510 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks24 networks, 2 internet exchanges
PeeringDB.
Also known asDU1 · Equinix DU1
AddressAlbertstrasse 27
Coordinates51.21963, 6.80715
Websiteequinix.com

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 700 m away (Stadtwerke Düsseldorf)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStation Eller, 220 kV, 3.2 km away
HV substations within 10 km20
Power plants within 50 km15 GW in 61 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.2 °C (2001 to 2025)
Cooling degree days142 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.96 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix DU1 - Dusseldorf use?

We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.

How close is Equinix DU1 - Dusseldorf to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 700 m away.

How clean is the power for Equinix DU1 - Dusseldorf?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates Equinix DU1 - Dusseldorf?

Equinix.

Data centers near Düsseldorf

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.