PlusServer DataStore Hamburg
PlusServer DataStore Hamburg is an operational data center operated by PlusServer in Hamburg, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PlusServer |
| Networks | 1 networks PeeringDB. |
| Address | König-Georg-Deich 2 |
| Coordinates | 53.47829, 9.99321 |
| Website | plusserver.com |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 70 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low (<10%) (Hamburg) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for PlusServer DataStore Hamburg?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates PlusServer DataStore Hamburg?
PlusServer.
Data centers near Hamburg
- nLighten Hamburg HAM1 2.9 km
- NorthC Hamburg 8.4 km · 6.8 MW
- n@work Hamburg Grevenweg 8.5 km
- Portus/IPHH HH3 (Wendenstrasse 251) 8.6 km · 9.7 MW
- euNetworks Colocation Hamburg 8.7 km · 45 MW
- n@work Hamburg Wendenstraße 8.8 km
- Artfiles w408 8.8 km
- ITENOS Hamburg (HAM1) 9.4 km
More PlusServer data centers
- PlusServer DataCore Köln Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.