Sentinel Ashburn - Building 1
Sentinel Ashburn - Building 1 is an operational data center operated by Sentinel Data Centers in Sterling, United States. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Sentinel Data Centers |
| Facility power | 16 MW (range 8.1 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,432 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Sentinel Ashburn - Building 2 |
| Address | Low Latency Lane 44595, 20166, Sterling |
| Coordinates | 38.99598, -77.45974 |
Power and grid
| Nearest high-voltage substation | Prentice Substation, 230 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 56 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 800 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Sentinel Ashburn - Building 1 use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How close is Sentinel Ashburn - Building 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Prentice Substation (230 kV), about 200 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Sentinel Ashburn - Building 1?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Sentinel Ashburn - Building 1?
Sentinel Data Centers.
Data centers near Sterling
- QTS Ashburn Lockridge 302 m · 13 MW
- Amazon IAD-285 362 m · 12 MW
- Amazon IAD-76 834 m · 22 MW
- Digital Realty IAD43 890 m · 65 MW
- QTS Ashburn 1 DC1 921 m · 72 MW
- Amazon IAD-606 985 m · 2.8 MW
- CloudHQ LC8 1.0 km · 140 MW
- QTS Ashburn Moran 1.0 km · 5 MW
Sources
Correct this page or get the data