Stream Data Centers - MN I
Stream Data Centers - MN I is an operational data center operated by Stream Data Centers in Chaska, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Stream Data Centers |
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,122 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Lightedge Data Center · StreamData Center |
| Address | 1708 W Creek Ln |
| Coordinates | 44.80843, -93.63693 |
| Website | streamdatacenters.com/datacenters/minneapolis-i |
Power and grid
| Utility | City Of Chaska (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 344 g CO₂ per kWh (Minnesota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 25.1%, coal 23%, nuclear 21.5%, gas 20.7%, solar 5.9%. Clean power: 55.8% |
| Industrial power price | USD 0.100 per kWh (Minnesota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.6 °C (2001 to 2025) |
| Cooling degree days | 347 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.8 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Minnesota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Stream Data Centers - MN I use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How clean is the power for Stream Data Centers - MN I?
The grid in Minnesota emits about 344 g CO₂ per kWh (2025). Largest sources: wind 25.1%, coal 23%, nuclear 21.5%.
Who operates Stream Data Centers - MN I?
Stream Data Centers.
Data centers near Chaska
- UHG Data Center 208 m · 38 MW
- Flexential - Minneapolis/Chaska (MSP01) 5.6 km · 15 MW
- Centersquare Minneapolis (MSP1) 14.2 km
- US Signal MN01 - Minneapolis 19.6 km
- EdgeConneX Minneapolis (EDCMSP01) 20.0 km
- Verizon - Bloomington Network 20.6 km · 7.4 MW
- NP Belle Plaine (MSP1) 23.3 km
- US Internet - Minnetonka 24.1 km
More Stream Data Centers data centers
- Stream Phoenix United States
- Stream Data Centers - DFW VII United States
- Stream Data Centers - Houston I United States
- Stream Data Centers - Chicago II United States
- Stream Data Centers - San Antonio II United States
- Stream Data Centers United States
- Stream Data Centers - Chicago I United States
Sources
Correct this page or get the data