Data Center Directory

Stream Data Centers - Houston I

Stream Data Centers - Houston I is an operational data center operated by Stream Data Centers in The Woodlands, United States. Our footprint estimate of its power is about 22 MW.

Key facts

StatusOperational
OperatorStream Data Centers
Facility power22 MW (range 11 MW to 35 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 18,211 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks5 networks, 1 internet exchanges
PeeringDB.
Also known asStream Data Centers Houston
Address4001 Technology Forest Blvd
Coordinates30.17780, -95.48649
Websitestreamdatacenters.com/datacenters/houston-the-woodlands

Power and grid

Nearest high-voltage substationGosling Substation, 138 kV, 800 m away (Entergy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRothwood Substation, 345 kV, 9.7 km away
HV substations within 10 km9
UtilityMid-South Electric Coop Assn (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineGulf South Pipeline Co, interstate pipeline, 3.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.4 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.7 °C (2001 to 2025)
Cooling degree days1,754 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Stream Data Centers - Houston I use?

We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.

How close is Stream Data Centers - Houston I to the power grid?

The nearest high-voltage substation in OpenStreetMap is Gosling Substation (138 kV), about 800 m away. The local utility is Mid-South Electric Coop Assn, in the ERCO balancing area.

How clean is the power for Stream Data Centers - Houston I?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Stream Data Centers - Houston I?

Stream Data Centers.

Data centers near The Woodlands

More Stream Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.