Telkom data center in Germiston is an operational data center operated by Telkom in Germiston, South Africa. Our footprint estimate of its power is about 1 MW.

Key facts

StatusOperational
OperatorTelkom
Facility power1 MW (range 0.4 MW to 2.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,099 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 430 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-26.21247, 28.15998

Power and grid

Nearest high-voltage substationGermiston North Substation, 132 kV, 2.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJupiter Substation, 275 kV, 4.9 km away
HV substations within 10 km6
Power plants within 50 km856 MW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature17.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.8 °C (2001 to 2025)
Cooling degree days588 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.68 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Telkom data center in Germiston use?

We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.

How close is Telkom data center in Germiston to the power grid?

The nearest high-voltage substation in OpenStreetMap is Germiston North Substation (132 kV), about 2.9 km away.

How clean is the power for Telkom data center in Germiston?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates Telkom data center in Germiston?

Telkom.

Data centers near Germiston

More Telkom data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.