Telkom data center in Germiston
Telkom data center in Germiston is an operational data center operated by Telkom in Germiston, South Africa. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telkom |
| Facility power | 1 MW (range 0.4 MW to 2.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,099 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -26.21247, 28.15998 |
Power and grid
| Nearest high-voltage substation | Germiston North Substation, 132 kV, 2.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Jupiter Substation, 275 kV, 4.9 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 856 MW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telkom data center in Germiston use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How close is Telkom data center in Germiston to the power grid?
The nearest high-voltage substation in OpenStreetMap is Germiston North Substation (132 kV), about 2.9 km away.
How clean is the power for Telkom data center in Germiston?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates Telkom data center in Germiston?
Telkom.
Data centers near Germiston
- Equinix JN1 - Johannesburg 7.3 km · 9.7 MW
- BT Games 8.7 km
- Teraco Johannesburg Campus, South Africa 9.1 km · 1.8 MW
- Teraco JB3 Data Centre 9.2 km · 24 MW
- OADC JNB1 - Johannesburg 9.3 km · 3.6 MW
- Teraco JB5 Isando Campus 9.5 km · 2.7 MW
- Rosebank Exchange 13.7 km · 1.7 MW
- Parklands 14.3 km · 3.8 MW
More Telkom data centers
- Rosebank Exchange South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.