Teraco Johannesburg Campus, South Africa
Teraco Johannesburg Campus, South Africa is an operational data center operated by Teraco Data Environments in Johannesburg, South Africa. Our footprint estimate of its power is about 1.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco Data Environments |
| Facility power | 1.8 MW (range 0.7 MW to 4.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,977 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 392 networks, 6 internet exchanges PeeringDB. |
| Also known as | Teraco JB1 Isando Campus · Teraco JB1 West · Teraco JB1 East |
| Address | 5 Brewery Street, Isando |
| Coordinates | -26.13796, 28.19752 |
| Website | teraco.co.za |
Power and grid
| Nearest high-voltage substation | Croydon Substation, 275 kV, 400 m away (Eskom) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 1.1 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco Johannesburg Campus, South Africa use?
We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.
How close is Teraco Johannesburg Campus, South Africa to the power grid?
The nearest high-voltage substation in OpenStreetMap is Croydon Substation (275 kV), about 400 m away.
How clean is the power for Teraco Johannesburg Campus, South Africa?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates Teraco Johannesburg Campus, South Africa?
Teraco Data Environments.
Data centers near Johannesburg
- Teraco JB3 Data Centre 185 m · 24 MW
- OADC JNB1 - Johannesburg 262 m · 3.6 MW
- Teraco JB5 Isando Campus 469 m · 2.7 MW
- Equinix JN1 - Johannesburg 2.0 km · 9.7 MW
- BT Games 6.6 km
- Telkom data center in Germiston 9.1 km · 1 MW
- JB2 Data Centre 10.6 km · 16 MW
- Teraco Johannesburg Bredell Campus 10.8 km · 3.9 MW
More Teraco Data Environments data centers
- Teraco CT2 Cape Town, South Africa South Africa
- Teraco Johannesburg Bredell Campus South Africa
- Teraco CT1 Cape Town, South Africa South Africa
- Teraco DB1 Durban, South Africa South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.