Teraco CT2 Cape Town, South Africa is an operational data center operated by Teraco Data Environments in Cape Town, South Africa. Our footprint estimate of its power is about 18 MW.

Key facts

StatusOperational
OperatorTeraco Data Environments
Facility power18 MW (range 8.8 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,648 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks25 networks, 2 internet exchanges
PeeringDB.
Also known asTeraco CT2
AddressBrackengate 2, 57 Tiber Rd, Brackenfell
Coordinates-33.90732, 18.67913
Websiteteraco.co.za

Power and grid

Nearest high-voltage substationMorgen Gronde Switching Station, 132 kV, 400 m away (City of Cape Town)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStikland Substation, 400 kV, 700 m away
HV substations within 10 km7
Power plants within 50 km4.1 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature16.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days449 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.56 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayExtremely High (>80%) (Western Cape)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Teraco CT2 Cape Town, South Africa use?

We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.

How close is Teraco CT2 Cape Town, South Africa to the power grid?

The nearest high-voltage substation in OpenStreetMap is Morgen Gronde Switching Station (132 kV), about 400 m away.

How clean is the power for Teraco CT2 Cape Town, South Africa?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates Teraco CT2 Cape Town, South Africa?

Teraco Data Environments.

Data centers near Cape Town

More Teraco Data Environments data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.