Teraco Johannesburg Bredell Campus
Teraco Johannesburg Bredell Campus is an operational data center operated by Teraco Data Environments in Johannesburg, South Africa. Our footprint estimate of its power is about 3.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco Data Environments |
| Facility power | 3.9 MW (range 1.6 MW to 9.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 32,786 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 22 networks, 1 internet exchanges PeeringDB. |
| Also known as | Teraco JB2 Bredell Campus |
| Address | 1 Riverfields Boulevard, Bredell |
| Coordinates | -26.07414, 28.27846 |
| Website | teraco.co.za/data-centre-locations |
Power and grid
| Nearest high-voltage substation | Kempton Park Municipal Substation, 132 kV, 6.6 km away (Kempton Park Municipality) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Esselen Substation, 275 kV, 7.7 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 1.1 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 592 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco Johannesburg Bredell Campus use?
We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.
How close is Teraco Johannesburg Bredell Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kempton Park Municipal Substation (132 kV), about 6.6 km away.
How clean is the power for Teraco Johannesburg Bredell Campus?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates Teraco Johannesburg Bredell Campus?
Teraco Data Environments.
Data centers near Johannesburg
- JB2 Data Centre 148 m · 16 MW
- Teraco JB4 Data Centre 5.6 km · 31 MW
- Teraco JB5 Isando Campus 10.3 km · 2.7 MW
- OADC JNB1 - Johannesburg 10.5 km · 3.6 MW
- Teraco JB3 Data Centre 10.6 km · 24 MW
- Teraco Johannesburg Campus, South Africa 10.8 km · 1.8 MW
- Equinix JN1 - Johannesburg 12.1 km · 9.7 MW
- BT Games 12.6 km
More Teraco Data Environments data centers
- Teraco CT2 Cape Town, South Africa South Africa
- Teraco Johannesburg Campus, South Africa South Africa
- Teraco CT1 Cape Town, South Africa South Africa
- Teraco DB1 Durban, South Africa South Africa