Teraco Johannesburg Bredell Campus

Teraco Johannesburg Bredell Campus is an operational data center operated by Teraco Data Environments in Johannesburg, South Africa. Our footprint estimate of its power is about 3.9 MW.

Key facts

StatusOperational
OperatorTeraco Data Environments
Facility power3.9 MW (range 1.6 MW to 9.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 32,786 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks22 networks, 1 internet exchanges
PeeringDB.
Also known asTeraco JB2 Bredell Campus
Address1 Riverfields Boulevard, Bredell
Coordinates-26.07414, 28.27846
Websiteteraco.co.za/data-centre-locations

Power and grid

Nearest high-voltage substationKempton Park Municipal Substation, 132 kV, 6.6 km away (Kempton Park Municipality)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationEsselen Substation, 275 kV, 7.7 km away
HV substations within 10 km7
Power plants within 50 km1.1 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature17.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days592 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.68 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Teraco Johannesburg Bredell Campus use?

We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.

How close is Teraco Johannesburg Bredell Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is Kempton Park Municipal Substation (132 kV), about 6.6 km away.

How clean is the power for Teraco Johannesburg Bredell Campus?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates Teraco Johannesburg Bredell Campus?

Teraco Data Environments.

Data centers near Johannesburg

More Teraco Data Environments data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.