Teraco JB4 Data Centre
Teraco JB4 Data Centre is an operational data center operated by Teraco in Thembisa, South Africa. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco |
| Facility power | 31 MW (range 15 MW to 49 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,549 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -26.02442, 28.26940 |
Power and grid
| Nearest high-voltage substation | Esselen Substation, 275 kV, 2.1 km away (Eskom) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 1.1 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 592 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco JB4 Data Centre use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
How close is Teraco JB4 Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Esselen Substation (275 kV), about 2.1 km away.
How clean is the power for Teraco JB4 Data Centre?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates Teraco JB4 Data Centre?
Teraco.
Data centers near Thembisa
- Teraco Johannesburg Bredell Campus 5.6 km · 3.9 MW
- JB2 Data Centre 5.7 km · 16 MW
- Teraco JB5 Isando Campus 14.1 km · 2.7 MW
- OADC JNB1 - Johannesburg 14.3 km · 3.6 MW
- Teraco JB3 Data Centre 14.4 km · 24 MW
- Teraco Johannesburg Campus, South Africa 14.5 km · 1.8 MW
- Bunker One 14.7 km
- Africa Data Centres, Johannesburg JHB1, South Africa 15.1 km · 13 MW
More Teraco data centers
- Teraco JB3 Data Centre South Africa
- JB2 Data Centre South Africa
- Teraco JB5 Isando Campus South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.