Data Center Directory

Teraco JB4 Data Centre

Teraco JB4 Data Centre is an operational data center operated by Teraco in Thembisa, South Africa. Our footprint estimate of its power is about 31 MW.

Key facts

StatusOperational
OperatorTeraco
Facility power31 MW (range 15 MW to 49 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 25,549 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 13,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-26.02442, 28.26940

Power and grid

Nearest high-voltage substationEsselen Substation, 275 kV, 2.1 km away (Eskom)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km2
Power plants within 50 km1.1 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature17.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days592 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.68 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Teraco JB4 Data Centre use?

We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.

How close is Teraco JB4 Data Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is Esselen Substation (275 kV), about 2.1 km away.

How clean is the power for Teraco JB4 Data Centre?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates Teraco JB4 Data Centre?

Teraco.

Data centers near Thembisa

More Teraco data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.