JB2 Data Centre

JB2 Data Centre is an operational data center operated by Teraco in Thembisa, South Africa. Our footprint estimate of its power is about 16 MW.

Key facts

StatusOperational
OperatorTeraco
Facility power16 MW (range 8 MW to 26 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,317 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-26.07532, 28.27777

Power and grid

Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does JB2 Data Centre use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

How clean is the power for JB2 Data Centre?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates JB2 Data Centre?

Teraco.