Data Center Directory

Equinix JN1 - Johannesburg

Equinix JN1 - Johannesburg is an operational data center operated by Equinix in Johannesburg, South Africa. Our footprint estimate of its power is about 9.7 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power9.7 MW (range 4.9 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,116 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks10 networks, 1 internet exchanges
PeeringDB.
Also known asEquinix
Address103 Brollo Road, Tunney, Germiston
Coordinates-26.15620, 28.19840
Websiteequinix.com/data-centers/europe-colocation/south-africa-colocation/johannesburg-data-centers/jn1

Power and grid

Nearest high-voltage substationCroydon Substation, 275 kV, 1.8 km away (Eskom)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
Power plants within 50 km1.1 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature17.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.8 °C (2001 to 2025)
Cooling degree days588 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.68 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix JN1 - Johannesburg use?

We estimate the facility power at about 9.7 MW. Estimate from building footprint, low confidence.

How close is Equinix JN1 - Johannesburg to the power grid?

The nearest high-voltage substation in OpenStreetMap is Croydon Substation (275 kV), about 1.8 km away.

How clean is the power for Equinix JN1 - Johannesburg?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates Equinix JN1 - Johannesburg?

Equinix.

Data centers near Johannesburg

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.