Data Center Directory

Teraco JB5 Isando Campus

Teraco JB5 Isando Campus is an operational data center operated by Teraco in Eden Glen, South Africa. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
OperatorTeraco
Facility power2.7 MW (range 1.1 MW to 6.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 22,449 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asTeraco JB5 Data Centre
Coordinates-26.13497, 28.20083

Power and grid

Nearest high-voltage substationCroydon Substation, 275 kV, 900 m away (Eskom)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km9
Power plants within 50 km1.1 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity699 g CO₂ per kWh (South Africa, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9%

Climate and water

Average temperature17.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.8 °C (2001 to 2025)
Cooling degree days588 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.68 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (Gauteng)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Teraco JB5 Isando Campus use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

How close is Teraco JB5 Isando Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is Croydon Substation (275 kV), about 900 m away.

How clean is the power for Teraco JB5 Isando Campus?

The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.

Who operates Teraco JB5 Isando Campus?

Teraco.

Data centers near Eden Glen

More Teraco data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.