OADC JNB1 - Johannesburg
OADC JNB1 - Johannesburg is an operational data center operated by Open Access Data Centres in Johannesburg, South Africa. Our footprint estimate of its power is about 3.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Open Access Data Centres |
| Facility power | 3.6 MW (range 1.4 MW to 8.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 29,656 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks, 1 internet exchanges PeeringDB. |
| Also known as | Teraco JB3 Isando Campus · OADC Isando |
| Address | 18 Electron Avenue, Isando |
| Coordinates | -26.13608, 28.19910 |
| Website | openaccessdc.net |
Power and grid
| Nearest high-voltage substation | Croydon Substation, 275 kV, 700 m away (Eskom) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 1.1 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 17.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 588 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.68 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Extremely High (>80%) (Gauteng) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does OADC JNB1 - Johannesburg use?
We estimate the facility power at about 3.6 MW. Estimate from building footprint, low confidence.
How close is OADC JNB1 - Johannesburg to the power grid?
The nearest high-voltage substation in OpenStreetMap is Croydon Substation (275 kV), about 700 m away.
How clean is the power for OADC JNB1 - Johannesburg?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates OADC JNB1 - Johannesburg?
Open Access Data Centres.
Data centers near Johannesburg
- Teraco JB3 Data Centre 132 m · 24 MW
- Teraco JB5 Isando Campus 212 m · 2.7 MW
- Teraco Johannesburg Campus, South Africa 262 m · 1.8 MW
- Equinix JN1 - Johannesburg 2.2 km · 9.7 MW
- BT Games 6.6 km
- Telkom data center in Germiston 9.3 km · 1 MW
- JB2 Data Centre 10.4 km · 16 MW
- Teraco Johannesburg Bredell Campus 10.5 km · 3.9 MW
More Open Access Data Centres data centers
- OADC Rondebosch South Africa
- OADC - Parklands South Africa
- OADC CPT1 - Cape Town South Africa
- OADC CPT3 - Cape Town South Africa
- OADC FIH1 - Kinshasa Congo - Kinshasa
- OADC LOS1 - Lagos Nigeria
- OADC, Port Elizabeth South Africa
- OADC, Umhlanga South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.