Teraco CT1 Cape Town, South Africa is an operational data center operated by Teraco Data Environments in Cape Town, South Africa. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco Data Environments |
| Networks | 199 networks, 4 internet exchanges PeeringDB. |
| Address | Great Westerford Building, 240 Main Road |
| Coordinates | -33.97087, 18.46522 |
| Website | teraco.co.za |
Power and grid
| Nearest high-voltage substation | Woodstock Main Substation, 132 kV, 5.5 km away (City of Cape Town) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Philippi Substation, 400 kV, 6.9 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 3.7 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 699 g CO₂ per kWh (South Africa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 81.3%, solar 8%, wind 4.7%, nuclear 4.2%, oil and other fossil 0.8%. Clean power: 17.9% |
Climate and water
| Average temperature | 16.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 449 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.56 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Extremely High (>80%) (Western Cape) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Teraco CT1 Cape Town, South Africa to the power grid?
The nearest high-voltage substation in OpenStreetMap is Woodstock Main Substation (132 kV), about 5.5 km away.
How clean is the power for Teraco CT1 Cape Town, South Africa?
The grid in South Africa emits about 699 g CO₂ per kWh (2025). Largest sources: coal 81.3%, solar 8%, wind 4.7%.
Who operates Teraco CT1 Cape Town, South Africa?
Teraco Data Environments.
Data centers near Cape Town
- OADC Rondebosch 1.3 km · 4.8 MW
- OADC CPT1 - Cape Town 1.7 km
- OADC CPT3 - Cape Town 7.1 km
- Africa Data Centres, Cape Town CPT1, South Africa 7.5 km
- Sentech data center in Durbanville 16.1 km
- Amazon AWS CPT - Atlantic 19.0 km · 7.4 MW
- Teraco CT2 Cape Town, South Africa 21.0 km · 18 MW
- Data center in Kuils River 21.1 km · 25 MW
More Teraco Data Environments data centers
- Teraco CT2 Cape Town, South Africa South Africa
- Teraco Johannesburg Bredell Campus South Africa
- Teraco Johannesburg Campus, South Africa South Africa
- Teraco DB1 Durban, South Africa South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.