Data Center Directory

ANZ Data Centre

ANZ Data Centre is an operational data center operated by ANZ in Gladstone Park, Australia. Our footprint estimate of its power is about 8.5 MW.

Key facts

StatusOperational
OperatorANZ
Facility power8.5 MW (range 4.2 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,074 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressHewitt Way 20
Coordinates-37.68812, 144.87719

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature13.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.3 °C (2001 to 2025)
Cooling degree days308 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does ANZ Data Centre use?

We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.

How clean is the power for ANZ Data Centre?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates ANZ Data Centre?

ANZ.

Data centers near Gladstone Park

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.