ANZ Data Centre
ANZ Data Centre is an operational data center operated by ANZ in Gladstone Park, Australia. Our footprint estimate of its power is about 8.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ANZ |
| Facility power | 8.5 MW (range 4.2 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,074 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Hewitt Way 20 |
| Coordinates | -37.68812, 144.87719 |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.3 °C (2001 to 2025) |
| Cooling degree days | 308 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ANZ Data Centre use?
We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.
How clean is the power for ANZ Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates ANZ Data Centre?
ANZ.
Data centers near Gladstone Park
- Microsoft MEL07 349 m · 39 MW
- NEXTDC M2 2.2 km
- NEXTDC M3 12.9 km · 5.8 MW
- Digital Realty MEL11 - Melbourne 13.6 km · 3.8 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 13.8 km · 8.3 MW
- Soul DataCentre 13.9 km · 1.1 MW
- CDC Brooklyn Campus 14.6 km · 15 MW
- CDC Melbourne BK1 14.8 km