Microsoft MEL07 is an operational data center operated by Microsoft in Gladstone Park, Australia. Our footprint estimate of its power is about 39 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 39 MW (range 19 MW to 62 MW) Estimate from building footprint, low confidence. Footprint estimate: about 32,173 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 17,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Garden Drive 70-90 |
| Coordinates | -37.68555, 144.87492 |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.3 °C (2001 to 2025) |
| Cooling degree days | 308 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft MEL07 use?
We estimate the facility power at about 39 MW. Estimate from building footprint, low confidence.
What chips does Microsoft MEL07 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft MEL07?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Microsoft MEL07?
Microsoft.
Data centers near Gladstone Park
- ANZ Data Centre 349 m · 8.5 MW
- NEXTDC M2 2.5 km
- NEXTDC M3 13.2 km · 5.8 MW
- Digital Realty MEL11 - Melbourne 13.7 km · 3.8 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 13.9 km · 8.3 MW
- Soul DataCentre 14.2 km · 1.1 MW
- CDC Brooklyn Campus 14.9 km · 15 MW
- CDC Melbourne BK1 15.0 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States