Data Center Directory

Cipher Digital data center in Kermit

Cipher Digital data center in Kermit is an operational data center operated by Cipher Digital in Kermit, United States. Our footprint estimate of its power is about 40 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).

Key facts

StatusOperational
OperatorCipher Digital
Facility power40 MW (range 16 MW to 99 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 330,884 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (AMD possible)
Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD.
GPU capacity if all AIabout 17,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCipher Black Pearl Data Center
Coordinates31.68962, -103.06947
Websitedatacentermap.com/usa/texas/kermit/cipher-black-pearl

Power and grid

UtilityTexas-New Mexico Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Nearest gas pipelineONEOK Westex Pipeline, intrastate pipeline, 700 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cipher Digital data center in Kermit use?

We estimate the facility power at about 40 MW. Estimate from building footprint, low confidence.

What chips does Cipher Digital data center in Kermit use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).

How clean is the power for Cipher Digital data center in Kermit?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Cipher Digital data center in Kermit?

Cipher Digital.