Data center in Pecos is an operational data center in Pecos, United States. Our footprint estimate of its power is about 4.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.9 MW (range 2.4 MW to 7.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,057 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.53275, -103.80627 |
Power and grid
| Utility | Aep Texas North Company (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Nearest gas pipeline | ONEOK Westex Pipeline, intrastate pipeline, 6.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Pecos use?
We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Pecos?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Data centers near Pecos
- Core Scientific Pecos TX Data Center 314 m · 30 MW
- Data center in Pecos 559 m · 1 MW
- Core Scientific COT2 Data Center 1.2 km · 18 MW
- IONIC Digital Cedarvale 34.0 km · 38 MW
- Cipher Digital data center in Kermit 71.9 km · 40 MW
- Lonestar Dream -Tarbush Site 72.0 km · 28 MW