Data center in Pecos

Data center in Pecos is an operational data center in Pecos, United States. Our footprint estimate of its power is about 4.9 MW.

Key facts

StatusOperational
Facility power4.9 MW (range 2.4 MW to 7.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,057 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates31.53275, -103.80627

Power and grid

UtilityAep Texas North Company (investor owned)
Electric retail service territory (HIFLD, US government).
Nearest gas pipelineONEOK Westex Pipeline, intrastate pipeline, 6.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity343 g CO₂ per kWh (Oklahoma, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1%
Industrial power priceUSD 0.082 per kWh (Oklahoma, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Oklahoma)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Pecos use?

We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Pecos?

The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.