Core Scientific COT2 Data Center is an operational data center in Pecos, United States. Our footprint estimate of its power is about 18 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 18 MW (range 7.3 MW to 46 MW) Estimate from building footprint, low confidence. Footprint estimate: about 152,292 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Farm to Market Road 2119 1939, 79772, Pecos |
| Coordinates | 31.53722, -103.81725 |
Power and grid
| Utility | Aep Texas North Company (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Nearest gas pipeline | ONEOK Westex Pipeline, intrastate pipeline, 6.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Core Scientific COT2 Data Center use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
What chips does Core Scientific COT2 Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
How clean is the power for Core Scientific COT2 Data Center?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Data centers near Pecos
- Data center in Pecos 1.2 km · 4.9 MW
- Core Scientific Pecos TX Data Center 1.4 km · 30 MW
- Data center in Pecos 1.7 km · 1 MW
- IONIC Digital Cedarvale 35.0 km · 38 MW
- Cipher Digital data center in Kermit 72.8 km · 40 MW