Core Scientific COT2 Data Center is an operational data center in Pecos, United States. Our footprint estimate of its power is about 18 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).

Key facts

StatusOperational
Facility power18 MW (range 7.3 MW to 46 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 152,292 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (AMD possible)
Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD.
GPU capacity if all AIabout 7,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressFarm to Market Road 2119 1939, 79772, Pecos
Coordinates31.53722, -103.81725

Power and grid

UtilityAep Texas North Company (investor owned)
Electric retail service territory (HIFLD, US government).
Nearest gas pipelineONEOK Westex Pipeline, intrastate pipeline, 6.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity343 g CO₂ per kWh (Oklahoma, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1%
Industrial power priceUSD 0.082 per kWh (Oklahoma, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Oklahoma)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Core Scientific COT2 Data Center use?

We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.

What chips does Core Scientific COT2 Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).

How clean is the power for Core Scientific COT2 Data Center?

The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.

Data centers near Pecos

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.