IONIC Digital Cedarvale
IONIC Digital Cedarvale is an operational data center operated by IONIC Digital in Pecos, United States. Our footprint estimate of its power is about 38 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | IONIC Digital |
| Facility power | 38 MW (range 15 MW to 96 MW) Estimate from building footprint, low confidence. Footprint estimate: about 319,660 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.51345, -103.44854 |
Power and grid
| Utility | Texas-New Mexico Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Nearest gas pipeline | ONEOK Westex Pipeline, intrastate pipeline, 200 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does IONIC Digital Cedarvale use?
We estimate the facility power at about 38 MW. Estimate from building footprint, low confidence.
How clean is the power for IONIC Digital Cedarvale?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates IONIC Digital Cedarvale?
IONIC Digital.
Data centers near Pecos
- Data center in Pecos 33.4 km · 1 MW
- Core Scientific Pecos TX Data Center 33.7 km · 30 MW
- Data center in Pecos 34.0 km · 4.9 MW
- Core Scientific COT2 Data Center 35.0 km · 18 MW
- Cipher Digital data center in Kermit 40.9 km · 40 MW
- Lonestar Dream -Tarbush Site 49.7 km · 28 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.