Data center in Pecos
Data center in Pecos is an operational data center in Pecos, United States. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1 MW (range 0.5 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 852 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.53335, -103.80042 |
Power and grid
| Utility | Aep Texas North Company (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Nearest gas pipeline | ONEOK Westex Pipeline, intrastate pipeline, 6.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Pecos use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Pecos?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Data centers near Pecos
- Core Scientific Pecos TX Data Center 289 m · 30 MW
- Data center in Pecos 559 m · 4.9 MW
- Core Scientific COT2 Data Center 1.7 km · 18 MW
- IONIC Digital Cedarvale 33.4 km · 38 MW
- Cipher Digital data center in Kermit 71.4 km · 40 MW
- Lonestar Dream -Tarbush Site 71.6 km · 28 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.