Core Scientific Pecos TX Data Center
Core Scientific Pecos TX Data Center is an operational data center in Pecos, United States. Our footprint estimate of its power is about 30 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 30 MW (range 12 MW to 76 MW) Estimate from building footprint, low confidence. Footprint estimate: about 252,392 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Farm to Market Road 2119 1851, 79772, Pecos |
| Coordinates | 31.53407, -103.80334 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 100 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Riverton Switching Station, 345 kV, 30.8 km away |
| HV substations within 10 km | 4 |
| Utility | Aep Texas North Company (investor owned) Electric retail service territory (HIFLD, US government). |
| Nearest gas pipeline | ONEOK Westex Pipeline, intrastate pipeline, 6.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 504 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.1 °C (2001 to 2025) |
| Cooling degree days | 1,708 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.62 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Core Scientific Pecos TX Data Center use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
What chips does Core Scientific Pecos TX Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
How close is Core Scientific Pecos TX Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 100 m away. The local utility is Aep Texas North Company.
How clean is the power for Core Scientific Pecos TX Data Center?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Data centers near Pecos
- Data center in Pecos 289 m · 1 MW
- Data center in Pecos 314 m · 4.9 MW
- Core Scientific COT2 Data Center 1.4 km · 18 MW
- IONIC Digital Cedarvale 33.7 km · 38 MW
- Cipher Digital data center in Kermit 71.6 km · 40 MW
- Lonestar Dream -Tarbush Site 71.9 km · 28 MW
Sources