CyrusOne data center in Sterling
CyrusOne data center in Sterling is an operational data center operated by CyrusOne in Sterling, United States. Its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 14 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 11 MW |
| GPU capacity if all AI | about 6,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | CyrusOne NVA4 |
| Coordinates | 38.98484, -77.42591 |
| Website | cyrusone.com/data-centers/north-america/sterling-virginia-nva4 |
Power and grid
| Nearest high-voltage substation | Sterling Park Substation, 230 kV, 1.2 km away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 46 |
| Utility | Northern Virginia Elec Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 300 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne data center in Sterling use?
Public data puts the facility power at about 14 MW. Derived from a tagged IT power value.
How close is CyrusOne data center in Sterling to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sterling Park Substation (230 kV), about 1.2 km away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.
How clean is the power for CyrusOne data center in Sterling?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates CyrusOne data center in Sterling?
CyrusOne.
Data centers near Sterling
- Centersquare Northern Virginia (IAD2) 192 m · 18 MW
- Amazon IAD-145 277 m · 20 MW
- Amazon IAD-144 379 m · 38 MW
- Amazon IAD-175 554 m · 9.8 MW
- Amazon IAD-214 823 m · 22 MW
- Amazon IAD-141 834 m · 68 MW
- Amazon IAD-192 931 m · 23 MW
- Amazon IAD-143 935 m · 27 MW
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.