Data Center L7
Data Center L7 is an operational data center in Renca, Chile. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.6 MW (range 0.3 MW to 1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 532 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.41024, -70.75238 |
Power and grid
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data Center L7 use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
How clean is the power for Data Center L7?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Data centers near Renca
- GTD Chile - Panamericana 6.4 km
- Data Center GTD 6.5 km · 3.1 MW
- SONDA - Quilicura 7.8 km · 2.1 MW
- Google Data Center 7.9 km · 18 MW
- Ascenty SCL01 - Santiago 9.1 km
- Cirion Santiago de Chile - SAN1 9.1 km · 1.2 MW
- Ascenty SCL02 - Santiago 9.2 km
- Campus Santiago Ascenty Data Center 9.3 km · 11 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.