Equinix DB3 - Dublin, Ballycoolin is an operational data center operated by Equinix in Dublin, Ireland. Our footprint estimate of its power is about 9.7 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power9.7 MW (range 4.8 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,062 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks31 networks, 5 internet exchanges
PeeringDB.
Also known asEquinix DB3
AddressUnit 2, North West Business Park, Ballycoolin
Coordinates53.41117, -6.34741
Websiteequinix.com/locations/ireland-colocation/dublin-data-centers/db3

Power and grid

Nearest high-voltage substationSnugborough 110kV Substation, 110 kV, 800 m away (EirGrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCorduff 220kV Substation, 220 kV, 1.5 km away
HV substations within 10 km39
Power plants within 50 km3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity261 g CO₂ per kWh (Ireland, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8%
Industrial power priceEUR 0.206 per kWh (Ireland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature24.3 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.74 kWh per m² per day
Wind at 50 m8 m/s average
Water stress todayLow (<10%) (Ireland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix DB3 - Dublin, Ballycoolin use?

We estimate the facility power at about 9.7 MW. Estimate from building footprint, low confidence.

How close is Equinix DB3 - Dublin, Ballycoolin to the power grid?

The nearest high-voltage substation in OpenStreetMap is Snugborough 110kV Substation (110 kV), about 800 m away.

How clean is the power for Equinix DB3 - Dublin, Ballycoolin?

The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.

Who operates Equinix DB3 - Dublin, Ballycoolin?

Equinix.

Data centers near Dublin

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.