Equinix PE2/PE3 - Perth is an operational data center operated by Equinix in Shenton Park, Australia. Our footprint estimate of its power is about 2.2 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power2.2 MW (range 1.1 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,841 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 940 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks43 networks, 4 internet exchanges
PeeringDB.
Also known asEquinix PE2
AddressFY 11 37 Lemnos St, Shenton Park WA 6008
Coordinates-31.95509, 115.79642
Websiteequinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe3

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 600 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 330 kV, 14.5 km away
HV substations within 10 km7
Power plants within 50 km2.1 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature17.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.8 °C (2001 to 2025)
Cooling degree days914 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.6 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayMedium - High (20-40%) (Western Australia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix PE2/PE3 - Perth use?

We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.

How close is Equinix PE2/PE3 - Perth to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 600 m away.

How clean is the power for Equinix PE2/PE3 - Perth?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Equinix PE2/PE3 - Perth?

Equinix.

Data centers near Shenton Park

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.