Equinix PE2/PE3 - Perth
Equinix PE2/PE3 - Perth is an operational data center operated by Equinix in Shenton Park, Australia. Our footprint estimate of its power is about 2.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 2.2 MW (range 1.1 MW to 3.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,841 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 940 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 43 networks, 4 internet exchanges PeeringDB. |
| Also known as | Equinix PE2 |
| Address | FY 11 37 Lemnos St, Shenton Park WA 6008 |
| Coordinates | -31.95509, 115.79642 |
| Website | equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe3 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 330 kV, 14.5 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 2.1 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 17.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.8 °C (2001 to 2025) |
| Cooling degree days | 914 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.6 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Medium - High (20-40%) (Western Australia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix PE2/PE3 - Perth use?
We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.
How close is Equinix PE2/PE3 - Perth to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 600 m away.
How clean is the power for Equinix PE2/PE3 - Perth?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Equinix PE2/PE3 - Perth?
Equinix.
Data centers near Shenton Park
- Rackmill 112 m
- QV.1 Perth 5.2 km
- Vocus Perth PER01 5.6 km
- aCure 5.9 km
- DC West 6.5 km
- NEXTDC P2 6.8 km · 48 MW
- Equinix PE1 - Perth 7.6 km
- Pawsey Supercomputing Centre Setonix 9.2 km · 0.8 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.