Etix Vendée #2
Etix Vendée #2 is an operational data center in Olonne-sur-Mer, France. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3 MW (range 1.5 MW to 4.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 825 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue Albert Einstein, Olonne-sur-Mer |
| Coordinates | 46.51548, -1.74783 |
| Website | etixeverywhere.com/fr |
Power and grid
| Nearest high-voltage substation | Poste de Sirmière, 225 kV, 28.9 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 32 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 12.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36 °C (2001 to 2025) |
| Cooling degree days | 146 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.7 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Low - Medium (10-20%) (Pays de la Loire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Etix Vendée #2 use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
How close is Etix Vendée #2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste de Sirmière (225 kV), about 28.9 km away.
How clean is the power for Etix Vendée #2?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near Olonne-sur-Mer
- Station d'atterrage 31.0 km · 1.6 MW
- ETIX Vendée #1 34.5 km
- Proginov 65.5 km · 11 MW
- UltraEdge Rezé 77.0 km · 1.5 MW
- Cogent Nantes 77.9 km
- SFR data center in Saint-Herblain 79.3 km · 2.6 MW
- OT - Armor 80.1 km · 6.1 MW
- ETIX Nantes #3 80.6 km · 4.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.