Eurofiber Datacenter Groningen 1

Eurofiber Datacenter Groningen 1 is an operational data center operated by Eurofiber in Groningen, Netherlands. Our footprint estimate of its power is about 2.6 MW.

Key facts

StatusOperational
OperatorEurofiber
Facility power2.6 MW (range 1.3 MW to 4.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,160 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks, 1 internet exchanges
PeeringDB.
Also known asBytesnet d'ROOT
AddressDe Bunders 1
Opened2019
Coordinates53.24461, 6.52731
Websiteeurofibercloudinfra.com

Power and grid

Nearest high-voltage substation110 kV Groningen Bloemsingel, 110 kV, 3.2 km away (TenneT)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation380 kV Vierverlaten, 380 kV, 4.9 km away
HV substations within 10 km10
Power plants within 50 km8.1 GW in 89 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days60 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.87 kWh per m² per day
Wind at 50 m7.5 m/s average
Water stress todayLow - Medium (10-20%) (Groningen)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Eurofiber Datacenter Groningen 1 use?

We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.

How close is Eurofiber Datacenter Groningen 1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 110 kV Groningen Bloemsingel (110 kV), about 3.2 km away.

How clean is the power for Eurofiber Datacenter Groningen 1?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates Eurofiber Datacenter Groningen 1?

Eurofiber.

Data centers near Groningen

More Eurofiber data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.