Data Center Directory

Google Datacenter Eemshaven

Google Datacenter Eemshaven is an operational data center operated by Google in Delfzijl, Netherlands. Our footprint estimate of its power is about 108 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).

Key facts

StatusOperational
OperatorGoogle
Facility power108 MW (range 43 MW to 270 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 898,507 m² site outline x 0.12 kW per m² of land.
AI chipsGoogle TPU (plus NVIDIA GPUs for cloud customers)
Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips.
GPU capacity if all AIabout 46,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Opened2017
Coordinates53.42352, 6.86192
Websitegoogle.com/about/datacenters/locations/eemshaven

Power and grid

Nearest high-voltage substation220 kV Saturn, 220 kV, 500 m away (TenneT)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km13
Power plants within 50 km6.8 GW in 54 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.4 °C (2001 to 2025)
Cooling degree days49 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.87 kWh per m² per day
Wind at 50 m8.3 m/s average
Water stress todayLow - Medium (10-20%) (Groningen)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Google Datacenter Eemshaven use?

We estimate the facility power at about 108 MW. Estimate from building footprint, low confidence.

What chips does Google Datacenter Eemshaven use?

No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).

How close is Google Datacenter Eemshaven to the power grid?

The nearest high-voltage substation in OpenStreetMap is 220 kV Saturn (220 kV), about 500 m away.

How clean is the power for Google Datacenter Eemshaven?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates Google Datacenter Eemshaven?

Google.

Data centers near Delfzijl

More Google data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.