QTS Groningen (GRO1)
QTS Groningen (GRO1) is an operational data center operated by QTS Realty Trust in Groningen, Netherlands. Our footprint estimate of its power is about 2.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS Realty Trust |
| Facility power | 2.8 MW (range 1.1 MW to 7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 23,235 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 29 networks, 3 internet exchanges PeeringDB. |
| Also known as | QTS Datacenter · Plus Ultra Groningen |
| Address | Zernikelaan 16 |
| Opened | 2023 |
| Coordinates | 53.24605, 6.52852 |
| Website | qtsdatacenters.com/data-centers/netherlands-groningen |
Power and grid
| Nearest high-voltage substation | 110 kV Groningen Bloemsingel, 110 kV, 3.2 km away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Vierverlaten, 380 kV, 5.1 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 8.1 GW in 88 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 60 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.87 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Groningen) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Groningen (GRO1) use?
We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.
How close is QTS Groningen (GRO1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 110 kV Groningen Bloemsingel (110 kV), about 3.2 km away.
How clean is the power for QTS Groningen (GRO1)?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates QTS Groningen (GRO1)?
QTS Realty Trust.
Data centers near Groningen
- Eurofiber Datacenter Groningen 1 179 m · 2.6 MW
- Rekenhal 1.0 km
- NorthC Groningen 1 5.6 km · 1.3 MW
- Datacenter Groningen 24.1 km
- Google Datacenter Eemshaven 29.7 km · 108 MW
- Data center in Delfzijl 30.0 km · 23 MW
- Google data center in Delfzijl 30.0 km · 36 MW
- Nieuwbouw datacenter QTS 30.4 km · 22 MW
More QTS Realty Trust data centers
- QTS Atlanta-Metro (ATL1) United States
- QTS Atlanta-Suwanee (SUW1) United States
- QTS Irving - Dallas (DFW1) United States
- QTS Chicago (CHI1) United States
- QTS Atlanta-Fayetteville (ATL2) United States
- QTS Eemshaven (EEM1) Netherlands
- QTS Sacramento (SAC1) United States
- QTS Ashburn (ASH1) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.