Eurofiber DC - AUC00 is an operational data center operated by Etix Everywhere in Auch, France. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorEtix Everywhere
Networks1 networks
PeeringDB.
Address47 Avenue Sambre et Meuse
Coordinates43.64606, 0.59760
Websitefullsave.com/fullsave-ouvre-un-datacenter-a-auch

Power and grid

Nearest high-voltage substationPoste de Jalis, 225 kV, 2.8 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km100 MW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.2 °C (2001 to 2025)
Cooling degree days454 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.82 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayLow - Medium (10-20%) (Occitanie)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Eurofiber DC - AUC00 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste de Jalis (225 kV), about 2.8 km away.

How clean is the power for Eurofiber DC - AUC00?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Eurofiber DC - AUC00?

Etix Everywhere.

Data centers near Auch

More Etix Everywhere data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.