Data Center Directory

GVTC

GVTC is an operational data center operated by GVTC in Timberwood Park, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorGVTC
Coordinates29.68640, -98.46265

Power and grid

Nearest high-voltage substationStonegate Substation, 138 kV, 1.1 km away (CPS Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSkyline Substation, 345 kV, 12.9 km away
HV substations within 10 km5
UtilityCity Of San Antonio (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineEl Paso Texas Pipeline Co, intrastate pipeline, 5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km8.4 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.5 °C (2001 to 2025)
Cooling degree days1,804 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.84 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is GVTC to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stonegate Substation (138 kV), about 1.1 km away. The local utility is City Of San Antonio, in the ERCO balancing area.

How clean is the power for GVTC?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates GVTC?

GVTC.

Data centers near Timberwood Park

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.