Iron Mountain Data Center - Western Pennsylvania (WPA-1)

Iron Mountain Data Center - Western Pennsylvania (WPA-1) is an operational data center operated by Iron Mountain in Boyers, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorIron Mountain
Networks4 networks
PeeringDB.
Address1137 Branchton Rd
Coordinates41.09210, -79.91219
Websiteironmountain.com/digital-transformation/data-centers/locations/pennsylvania-data-center

Power and grid

Nearest high-voltage substationKiesters Substation, 138 kV, 10.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHandsome Lake Substation, 345 kV, 23.8 km away
UtilityCentral Electric Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNational Fuel Gas Distr Co, intrastate pipeline, 11.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.8 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity387 g CO₂ per kWh (Pennsylvania, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3%
Industrial power priceUSD 0.105 per kWh (Pennsylvania, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.8 °C (2001 to 2025)
Cooling degree days390 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.63 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayLow - Medium (10-20%) (Pennsylvania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Iron Mountain Data Center - Western Pennsylvania (WPA-1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Kiesters Substation (138 kV), about 10.7 km away. The local utility is Central Electric Coop, INC, in the PJM balancing area.

How clean is the power for Iron Mountain Data Center - Western Pennsylvania (WPA-1)?

The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.

Who operates Iron Mountain Data Center - Western Pennsylvania (WPA-1)?

Iron Mountain.

Data centers near Boyers

More Iron Mountain data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.