ModernOne Data Solutions Sdn. Bhd.
ModernOne Data Solutions Sdn. Bhd. is an operational data center operated by ModernOne Data Solutions Sdn. Bhd. in Kajang, Malaysia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | ModernOne Data Solutions Sdn. Bhd. |
| Address | No 93-2A, Jalan TKS 1,, Taman Kajang Sentral, |
| Coordinates | 2.97731, 101.79622 |
| Website | nocser.net |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 3.1 km away (Tenaga Nasional) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 5.7 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 6.6 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 25.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.4 °C (2001 to 2025) |
| Cooling degree days | 2,765 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.83 kWh per m² per day |
| Wind at 50 m | 2.6 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is ModernOne Data Solutions Sdn. Bhd. to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 3.1 km away.
How clean is the power for ModernOne Data Solutions Sdn. Bhd.?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates ModernOne Data Solutions Sdn. Bhd.?
ModernOne Data Solutions Sdn. Bhd..
Data centers near Kajang
- MY03 13.7 km
- JARING Bukit Jalil 14.2 km
- MEASAT DC Cyberjaya 16.0 km
- AIMS 16.0 km · 2.2 MW
- TMONE Klang Valley Data Center 16.2 km · 5.4 MW
- TM ONE CBJ1, Cyberjaya 16.3 km
- CX2 / MY01 Cyberjaya Malaysia 16.4 km
- Data center in Bukit Jalil 16.6 km · 2.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.