Data Center Directory

QTS Data Center - Hillsboro 3

QTS Data Center - Hillsboro 3 is an operational data center operated by Quality Technology Services in Hillsboro, United States. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
OperatorQuality Technology Services
Facility power2.7 MW (range 1.1 MW to 6.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 22,654 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNortheast Schaaf Street, 97124, Hillsboro
Coordinates45.57019, -122.91983
Websiteq.com/data-centers/hillsboro-3

Power and grid

Nearest high-voltage substationSunset Substation, 230 kV, 1.9 km away (Portland General Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km11
UtilityPortland General Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPGE
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 13 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km814 MW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.3 °C (2001 to 2025)
Cooling degree days79 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does QTS Data Center - Hillsboro 3 use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

How close is QTS Data Center - Hillsboro 3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Sunset Substation (230 kV), about 1.9 km away. The local utility is Portland General Electric Co, in the PGE balancing area.

How clean is the power for QTS Data Center - Hillsboro 3?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Who operates QTS Data Center - Hillsboro 3?

Quality Technology Services.

Data centers near Hillsboro

More Quality Technology Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.