QTS Data Center - Hillsboro 3 is an operational data center operated by Quality Technology Services in Hillsboro, United States. Our footprint estimate of its power is about 2.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 2.7 MW (range 1.1 MW to 6.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,654 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast Schaaf Street, 97124, Hillsboro |
| Coordinates | 45.57019, -122.91983 |
| Website | q.com/data-centers/hillsboro-3 |
Power and grid
| Nearest high-voltage substation | Sunset Substation, 230 kV, 1.9 km away (Portland General Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 13 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 814 MW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Data Center - Hillsboro 3 use?
We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.
How close is QTS Data Center - Hillsboro 3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sunset Substation (230 kV), about 1.9 km away. The local utility is Portland General Electric Co, in the PGE balancing area.
How clean is the power for QTS Data Center - Hillsboro 3?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates QTS Data Center - Hillsboro 3?
Quality Technology Services.
Data centers near Hillsboro
- Digital Realty PDX11 Data Center 187 m · 27 MW
- Digital Realty PDX11 Data Center 344 m · 27 MW
- Flexential - Portland/Hillsboro 2 (PDX02) 1.4 km · 24 MW
- QTS Data Center - Hillsboro 1 1.4 km · 17 MW
- Meta-QTS Hillsboro 2 1.5 km · 243 MW
- QTS Hillsboro (HIL1) 1.6 km
- QTS Data Center - Hillsboro 2 1.6 km · 18 MW
- EdgeConneX - Portland POR03 1.6 km · 8.4 MW
More Quality Technology Services data centers
- QTS Richmond 1 United States
- QTS Piscataway Data Center United States
- QTS Richmond 2 Data Center United States
- QTS Richmond 3 Data Center United States
- QTS Ashburn 1 DC1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.