Torquay Cable Landing Station is an operational data center operated by SUBCO in Torquay, Australia. Our footprint estimate of its power is about 0.5 MW.

Key facts

StatusOperational
OperatorSUBCO
Facility power0.5 MW (range 0.3 MW to 0.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 454 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 210 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBaines Crescent 33
Coordinates-38.32744, 144.31287

Power and grid

Nearest high-voltage substationGeelong Terminal Station, 220 kV, 27.3 km away (AusNet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km303 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.7 °C (2001 to 2025)
Cooling degree days115 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.37 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Torquay Cable Landing Station use?

We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.

How close is Torquay Cable Landing Station to the power grid?

The nearest high-voltage substation in OpenStreetMap is Geelong Terminal Station (220 kV), about 27.3 km away.

How clean is the power for Torquay Cable Landing Station?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Torquay Cable Landing Station?

SUBCO.

Data centers near Torquay