Amazon Web Services data center in Drogheda is a data center under construction operated by Amazon Web Services in Drogheda, Ireland. Our footprint estimate of its power is about 19 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusUnder construction
OperatorAmazon Web Services
Facility power19 MW (range 9.7 MW to 31 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 16,102 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAmazon Web Services
Coordinates53.70515, -6.38425

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 300 m away (EirGrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 220 kV, 17.1 km away
HV substations within 10 km5
Power plants within 50 km3.4 GW in 35 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity261 g CO₂ per kWh (Ireland, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8%
Industrial power priceEUR 0.206 per kWh (Ireland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature24.3 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.74 kWh per m² per day
Wind at 50 m8 m/s average
Water stress todayLow (<10%) (Ireland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon Web Services data center in Drogheda use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

What chips does Amazon Web Services data center in Drogheda use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon Web Services data center in Drogheda to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 300 m away.

How clean is the power for Amazon Web Services data center in Drogheda?

The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.

Who operates Amazon Web Services data center in Drogheda?

Amazon Web Services.

Data centers near Drogheda

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.