Data Center Directory

Centersquare Northern Virginia (IAD3)

Centersquare Northern Virginia (IAD3) is an operational data center operated by Centersquare in Sterling, United States. Its power is about 3 MW.

Key facts

StatusOperational
OperatorCentersquare
Facility power3 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power2 MW
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks, 1 internet exchanges
PeeringDB.
Also known asCentersquare IAD3
Address22995 Wilder Court
Coordinates38.98023, -77.44349
Websitecentersquaredc.com/data-centers/northern-virginia

Power and grid

Nearest high-voltage substationGlobal Plaza Substation, 230 kV, 1.6 km away (Dominion Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km47
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 900 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centersquare Northern Virginia (IAD3) use?

Public data puts the facility power at about 3 MW. Derived from a tagged IT power value.

How close is Centersquare Northern Virginia (IAD3) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Global Plaza Substation (230 kV), about 1.6 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Centersquare Northern Virginia (IAD3)?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Centersquare Northern Virginia (IAD3)?

Centersquare.

Data centers near Sterling

More Centersquare data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.